Saturday, 9 June 2018

CS6403 SOFTWARE ENGINEERING




General info: CS6403                                           SOFTWARE ENGINEERING
University – Anna university,
Tamil Nadu, India
Marks: UNIT 1 to 5 – 9+3 each unit 
Period - TOTAL (L:45+T:15): 60 PERIODS 

OBJECTIVES:
The student should be made to:
1)     Understand the phases in a software project 
2)     Understand fundamental concepts of requirements engineering and Analysis Modelling.
3)     Understand the major considerations for enterprise integration and deployment.
4)     Learn various testing and maintenance measures


UNIT I  - SOFTWARE PROCESS AND PROJECT MANAGEMENT
Introduction to Software Engineering, Software Process, Perspective and Specialized Process Models – Software Project Management: Estimation – LOC and FP Based Estimation, COCOMO Model – Project Scheduling – Scheduling, Earned Value Analysis - Risk Management.
UNIT II    REQUIREMENTS ANALYSIS AND SPECIFICATION  
Software Requirements: Functional and Non-Functional, User requirements, System requirements, Software Requirements Document – Requirement Engineering Process: Feasibility Studies, Requirements elicitation and analysis, requirements validation, requirements management-Classical analysis: Structured system Analysis, Petri Nets- Data Dictionary.
UNIT III         SOFTWARE DESIGN
Design process – Design Concepts-Design Model– Design Heuristic – Architectural Design – Architectural styles, Architectural Design, Architectural Mapping using Data Flow- User Interface Design: Interface analysis, Interface Design –Component level Design: Designing Class based components, traditional Components.
UNIT IV        TESTING AND IMPLEMENTATION
Software testing fundamentals-Internal and external views of Testing-white box testing- basis path testing-control structure testing-black box testing- Regression Testing – Unit Testing – Integration Testing – Validation Testing – System Testing And Debugging – Software Implementation Techniques: Coding practices-Refactoring.
UNIT V        PROJECT MANAGEMENT
Estimation – FP Based, LOC Based, Make/Buy Decision, COCOMO II - Planning – Project Plan, Planning Process, RFP Risk Management – Identification, Projection, RMMM - Scheduling and Tracking –Relationship between people and effort, Task Set & Network, Scheduling, EVA - Process and Project Metrics.

OUTCOMES: At the end of the course, the student should be able to
1)    Identify the key activities in managing a software project.
2)     Compare different process models. 
3)     Concepts of requirements engineering and Analysis Modeling.
4)     Apply systematic procedure for software design and deployment.
5)     Compare and contrast the various testing and maintenance. 

TEXT BOOK:     1.  Roger S. Pressman, “Software Engineering – A Practitioner’s Approach”, Seventh Edition Mc Graw-Hill International Edition, 2010.     
  REFERENCES:
1. Ian Sommerville, “Software Engineering”, 9th Edition, Pearson Education Asia, 2011.
 2. Rajib Mall, “Fundamentals of Software Engineering”, Third Edition, PHI Learning Private Limited ,2009.
3. Pankaj Jalote, “Software Engineering, A Precise Approach”, Wiley India, 2010. 4. Kelkar S.A., “Software Engineering”, Prentice Hall of India Pvt Ltd, 2007.
 5. Stephen R.Schach, “Software Engineering”, Tata McGraw-Hill Publishing Company Limited, 2007. 6. http://nptel.ac.in/.   VA - Process and Project Metrics.

Notes from studentfocus.com: Unit-1, Unit-2, Unit-3, Unit-4, Unit-5


No comments:

Post a Comment

Active Employee Report

 Active Employee Report SELECT  PPPMF.PRIORITY, "PER_ALL_PEOPLE_F_1"."PERSON_NUMBER"             AS "PERSON_NUMBER...